Contact
Tomáš Konček
address:
Síd. 9 mája 318/3, 922 03 VRBOVÉ
phone:
+421 904 845 516
e-mail:
elektroprojekt@elektro-projekt.sk
web:
www.elektro-projekt.sk









Projects
Inalfa roof systems
- Building electrical installation project - technical section,
- Project documentation for operating equipment,
- Completion of technical documentation accompanying a machine tool,
MBL TRANS s.r.o. Trnava (Moravany nad Váhom facility)
- Electrical installation project documentation for service center,
Volkswagen Slovakia a.s. Bratislava
- Project documentation for the electrical installation and lightning protection system (HVAC ductwork) (as-built documentation) in the H6b production hall. - Project documentation for sanding cabins and all related mechanical equipment to exhaust, filter and return clean air to production areas.
- Project documentation for the electrical installation of sanding tunnels, PBF and ABT cabins for manual sanding of car bodies in the H4a production hall (as-built documentation),
- Project documentation for electrical equipment to remove particulate matter from sanding tunnels and cabins, filtration and fresh air intake from outdoor areas with filtration, conditioning and distribution to production areas. Equipment installed in the H4a production hall.
- Project documentation for the electrical installation for the KAMABT1 and KAMABT2 production lines (as-built documentation) used to install body superstructure components in the H4a production hall.
- Project documentation for the electrical installation of Vahle transport trolley systems (equipment no. 37-E00-01EKAEHB11, no. 37-E00-01EKAEHB21, no. 37-E00-01EKAEHB41, no. 37-E00-01EKAEHB42, no. 37-E00-01EKAEHB51 and no. 37-E00-01EKAEHB52) used to transport body components in the H4a production hall.
Apartment building at Sídlisko 9. mája 314/6 Vrbové
Project documentation for the lightning protection system of the building (apartment building).
SHOPPING CENTER (EXTENSION OF YARD WINGS) Hlohovec
- Project documentation for the electrical installation of the connection and feeder cables for connecting to the building's electrical distribution switchgear
- Project documentation for the interior electrical installation (medical premises),
- Project documentation for the electrical installation of the feeder cables for powering X-ray equipment
- Project documentation for the electrical installation of the exam rooms and preparation for the electrostatic conductive flooring
DURISOL s.r.o.
- Project documentation for the electrical installation of the office building (1st and 2nd floors)
- Project documentation of the lightning protection system (LPS for exterior and interior protection) of the office building
PUCARO ELEKTRO-ISOLIERSTOFFE GmbH - o.z. Piešťany
- Project documentation for the electrical installation of production and office premises,
- Project documentation for the electrical installation of the press shop,
- Project documentation for the electrical installation of the exterior lighting system,
- Project documentation for the electrical installation of the service department's workshop,
- Completion of technical documentation accompanying a machine tool,
Apartment building at Royova 1, Piešťany
- Project documentation for the electrical installation of the common areas, technical areas and feeder cables to the individual apartment units in the apartment building.
LYCOS – Trnavské sladovne spol. s.r.o.
- Project documentation for the electrical installation of technical equipment used with the ASG-40 flow scale and design of the equipment switchgear.
Town of Pečeňady
- Project documentation for the low voltage electrical connection
Town of Zemianské Podhradie
- Project documentation of electrical connections and low voltage feeders for the construction of family homes.
Warehouse of semi-finished construction and carpentry products
- Project documentation for the electrical installation of the warehouse of semi-finished construction and carpentry products (warehouse, office and sanitary
facilities).
- Project for the lightning protection system
- Project for interior electrical installation
- Project for artificial and emergency lighting
Town of Radošina
- Project documentation for electrical connections and low voltage feeders for the construction of family homes.
Stredoslovenská energetika a.s. regional office in Prievidza
- Project documentation for the electrical installation of distribution lines to serve newly installed underground distribution cabling boxes in the town of Radošina (new residential zone)
BETÓN Borovce spol. s.r.o.
- Project for the electrical installation of a low voltage connection
- Project for the water removal system used in the excavation zone (180 m of aerial cabling)
Apartment building Pečeňady
- Project documentation for the electrical installation of the distribution riser and common areas and feeders to apartment units
Apartment building at ul. Andreja Hlinku 40, Piešťany
- Project documentation for the electrical installation of the distribution riser and feeders to apartment units
Design of grounding network for the functional grounding of the electrical installation
J.M.L.I. spol. s.r.o.
- Project documentation for the electrical connection and feeder for a new building to produce construction mixes
- Project documentation for the lightning protection system for building SO 01 - production hall,
- Project documentation for the lightning protection system for building SO 02 - production hall,
-Project documentation for the lightning protection system for the storage hall and outdoor shelter,
-Project documentation for electrical installation of the artificial and emergency lighting of production areas in building SO 02 - production hall,
- Project documentation for the electrical installation and lightning protection system (as-built documentation) for the SO 03 production storage hall used to produce construction mixes,
Hrachovište
- Project documentation for public roadway lighting (state road no. 504023) in the town of Hrachovište, in the Nové Mesto nad Váhom district.
- Project documentation for public lighting in the construction of family homes and lighting of tennis courts.
Gardening equipment store, Veľký Kýr
- Project documentation for electrical installation of store premises, warehouse, office space and workshop.
- Design of artificial, emergency and egress lighting.
Town of Veselé
- Project documentation for the low voltage electrical connection and feeder to wastewater pumping station
Family homes in Chtelnica
- Electrical installation projects for family homes (basement, ground floor and upper floors)
Family homes in Trnava
- Electrical installation projects for family homes (basement, ground floor and upper floors)
Západoslovenská energetika a.s. regional office in Trenčín
- Project for distribution lines for the construction of family homes in the town of Hrachovište.
Apartment building at ul. A. Dubčeka 3535/6 and /8, Piešťany
- Project documentation for the lighting protection system for the building.
Bytový podnik Piešťany spol. s.r.o.
- Completion of a report to determine the outside impact of an office and production building and related annexes and independent structures
P&P Business s.r.o.
- Project documentation for electrical installation (as-built documentation) of an office and production building.
City of Vrbové
- Project documentation for electrical installation (as-built documentation) of artificial public lighting.
Kapital Invest s.r.o.
- Project documentation for electrical installation and lightning protection system (as-built documentation) for a production building on Teplická Street in Piešťany.
Verifications
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H2
- Technical audit of electrical installation for transport track A800 and A900,
- Technical audit of electrical installation for transport track on the production line (equipment no. 1E195703) for carrying bodies in sandblasting cabins,
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01E601030),
- Technical audit of electrical installation of the power switchgear for Internet network infrastructure using optical cabling (equipment no.: 37-E00-01E601060),
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H2a
- Technical audit of electrical installation - wastewater treatment plant (V0641 S0),
- Technical audit of electrical installation - BC cabin (V0641 S3),
- Technical audit of electrical installation - air filtration (V0641 S4),
- Technical audit of electrical installation - cooling equipment (V0641 S5),
- Technical audit of electrical installation - air cabin (V0641 S6),
- Technical audit of electrical installation - CC cabin (V0641 S3),
- Technical audit of electrical installation - air filtration (V0641 S8),
- Technical audit of electrical installation - cooling equipment (V0641 S9),
- Technical audit of electrical installation - compressor power (V0647 S0),
- Technical audit of electrical installation - compressors (V0647 S1 and S2),
- Technical audit of electrical installation - test equipment (V0650),
- Technical audit of electrical installation - wastewater treatment plant (LV821 S0),
- Technical audit of electrical installation - sludge presses 1 and 2 (LV821 S1 and S2),
- Technical audit of electrical installation - demineralization station (LV822),
- Technical audit of electrical installation - E scrub BC (LV823),
- Technical audit of electrical installation - E scrub CC (LV824),
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H3
- Technical audit of electrical installation of bar code scanner station (equipment no.: 37-E00-01MA5AM4),
- Technical audit of electrical installation of bar code scanner station (equipment no.: 37-E00-01MA5BM4),
- Technical audit of electrical installation of bar code scanner station (equipment no.: 37-E00-01MA51M4),
- Technical audit of electrical installation at station used to mate bodies to SUV chassis (equipment no.: 37-E00-01E196303), production line =M1FWE1,
- Technical audit of electrical installation of station 0010 to install the upper arm on a round spindle (equipment no.: 37-E00-01EM1QLV11), production line =M1QLV1,
-Technical audit of electrical installation of station 113020 (equipment no.: 37-E00-01E196303), production line =M1FWE1,
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01E601014) transport between robotic stations for installing roof systems,
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01E601015),
- Technical audit of electrical installation of production line =MFSKD33E (equipment no.: 37-E00-01E601040),
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H4a
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB11),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB12),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB13),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB14),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB15),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB16),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB17),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB21),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB22),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB23),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB24),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB25),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB26),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB27),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB28),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB29),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB31),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB32),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB33),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKASRB34),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01EKARFZ1) to transport bodies in and out of the dryer,
- Technical audit of electrical installation of feeder cables for powering equipment switchgear 37-E00-01EK1VTK11 – dryer,
- Technical audit of electrical installation of feeder cables for powering electrical switchgear KAV-17-1-5 (B-724400.247 for powering production lines,
- Technical audit of electrical installation of production line for installing superstructure components (equipment no.: 37-E00-01EKAMABT1),
- Technical audit of electrical installation of production line for installing superstructure components (equipment no.: 37-E00-01EKAMABT2),
- Technical audit of electrical installation in sanding tunnels and cabins for manual sanding of bodies and separate body components (equipment no.: 37-E00-01EKAMFIN1),
- Technical audit of electrical installation in sanding tunnels and cabins for manual sanding of bodies and separate body components (equipment no.: 37-E00-01EKAMFIN2),
- Technical audit of electrical installation of electrical equipment to remove particulate matter from sanding tunnels and cabins, filtration and fresh air intake from outdoor areas with filtration, conditioning and distribution to production areas (equipment no.: 37-E00-01EKA-ALU10) – Al sanding tunnel,
- Technical audit of electrical installation of electrical equipment to remove particulate matter from sanding tunnels and cabins, filtration and fresh air intake from outdoor areas with filtration, conditioning and distribution to production areas (equipment no.: 37-E00-01EKA-ALU21 a 37-E00-01EKA-ALU22) - hybrid sanding tunnel,
- Technical audit of electrical installation of equipment used to modify media for the sanding tunnels and cabins (equipment no.: 37-E00-01EKA-ALU30),
- Technical audit of electrical installation for artificial, emergency and egress lighting around metal platforms at a height of 6.3 m and in sanding tunnel no. 1 and ABT cabin for manual sanding of bodies and body superstructure components (equipment no.: 37-E00-01EKA-ALU40),
- Technical audit of electrical installation for artificial, emergency and egress lighting around metal platforms at a height of 6.3 m and in sanding tunnel no. 2 and ABT cabin for manual sanding of bodies and body superstructure components (equipment no.: 37-E00-01EKA-ALU50),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB11),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB21),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB31),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB32),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB41),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB42),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB51),
- Technical audit of electrical installation of the Vahle transport trolley system for transporting body components (equipment no.: 37-E00-01EKAEHB52),
- Technical audit of electrical installation of the power switchgear for Internet network infrastructure using optical cabling (equipment no.: 37-E00-01EKAF1NS1),
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H6a
- Technical audit of electrical installation of the EHB transport trolley system (300 m) for transporting body components for the Touareg model,
- Technical audit of L600 transport track (bridge M1 from production hall H6a welding shop),
- Technical audit of electrical installation for the control cabin for body and superstructure components (AUDIT NSF) and measuring the intensity of lighting in work areas,
- Technical audit of electrical installation of transport track A100 and A700,
- Technical audit of electrical installation of transport track I200,
- Technical audit of electrical installation of transport track L100 and L200,
- Technical audit of electrical installation of stacker for skid storage,
- Technical audit of electrical installation of transport track L600 (bridge M1 from production hall H6a welding shop),
- Technical audit of electrical installation of transport roller track (equipment no.: B 37-01E850031),
- Technical audit of electrical installation of transport roller track (equipment no.: C 37-01E850032),
- Technical audit of electrical installation of transport roller track (equipment no.: D 37-01E850033),
- Technical audit of electrical installation of transport roller track (equipment no.: E 37-01E850034),
- Technical audit of electrical installation of transport roller track (equipment no.: F 37-01E850035),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-E00-01E601010),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-01E850036),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-01E601011),
- Technical audit of electrical installation of transport roller track (equipment no.: 37-01E601012),
- Technical audit of electrical installation of transport roller track (equipment no.: K 37-01E850039),
- Technical audit of electrical installation of transport roller track (equipment no.: L 37-01E850040),
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H6b
- Technical audit of electrical installation of transport roller track + entry and exit lift,
- Technical audit of electrical installation of transport track D100 and D500 in production hall M2,
- Technical audit of electrical installation - Switchgear D304 in production hall M2,
- Technical audit of electrical installation of transport track A200, A900,
- Technical audit of electrical installation of transport track K600, K800 in the production hall H6a welding shop,
- Technical audit of electrical installation of transport track L300, L700, L800, L900, L1000, L1600 and L 1700 in the production hall H6a welding shop,
- Technical audit of electrical installation of transport track O800 in the production hall H6a welding shop,
- Technical audit of electrical installation of transport track B in the production hall H6a welding shop (4 x technical lifts. 11 x control panels for roller track transport zones),
- Technical audit of electrical installation of transport track C in the production hall H6a welding shop (4 x technical lifts. 8 x control panels for roller track transport zones),
- Technical audit of electrical installation of transport track C in the production hall H6a welding shop (4 x technical lifts. 8 x control panels for roller track transport zones),
- Technical audit of electrical installation of transport track C in the production hall H6a welding shop (4 x technical lifts. 8 x control panels for roller track transport zones),
- Technical audit of electrical installation of transport track C in the production hall H6a welding shop (2 x technical lifts. 3 x control panels for roller track transport zones),
- Technical audit of electrical installation of transport track H in production hall H3 assembly (control panels for roller track transport zones used to transport bodies),
- Technical audit of electrical installation of transport track I in production hall H3 assembly (control panels for roller track transport zones used to transport bodies),
- Technical audit of electrical installation of SEW Eurodrive, type KH87 DV132HL4/BM/HR/TF/EV1S3, IP 54, 9.2kW gear motor recuperation units for loading transport lifts for storing bodies in storage racks,
VOLKSWAGEN SLOVAKIA a. s. Bratislava - Production Hall H8
- Technical audit of electrical installation of production line in front of front axle frame assembly (equipment no.: 37-E00-01EM1HRV11),
- Technical audit of electrical installation of the rear axle measurement and adjustment stations for Touareg and Q7 (equipment no.: 37E90D335868),
- Technical audit of electrical installation of front wheel unit line (equipment no.: 37-E00-01EM1SLV11),
- Technical audit of electrical installation of VAHLE transport trolley system used to transport motors before motor installation (equipment no.: 37-E00-01EM1TWO11),
- Technical audit of electrical installation of production line before rear axle installation (equipment no.: 1E196254),
- Technical audit of electrical installation of production line before motor installation (equipment no.: 137-E00-01E196300),
- Technical audit of electrical installation of production line transport track (equipment no.: 11-E-20623),
- Technical audit of electrical installation of production line before chassis assembly (equipment no.: 37-E00-01E196302z),
- Technical audit of electrical installation of production line transport track (equipment no.: 37-E01-01E196213) and semi-automatically controlled handler for moving batteries for NSF passenger cars (Volkswagen Up, Škoda Citygo and Seat Mii) with electric and hybrid drive,
- Technical audit of electrical installation for 230V/16A outlet circuits for powering controllers and power supply connections for Atlas Copco nutrunners on the production line (equipment no.: 1-E-196211),
- Technical audit of electrical installation for 230V/16A outlet circuits for HMI touch screen terminal of production line =M1FEV1 (equipment no.: 137-E00-01E196300),
- Technical audit of electrical installation for 230V/16A outlet circuits for HMI touch screen terminal of production line =M1FEV1 (equipment no.: 137-E00-01E196302),
INALFA Roof Systems Slovakia s.r.o.
- Electrical audit of machine tooling equipment and production lines,
- Technical audit of machinery, equipment, appliances, hand tools and extension cords,
- Technical audit of production hall buildings and lightning protection systems,
- Technical audit of electrical installation of automatic pressure stations,
- Technical audit of Panorama roof BMW production line for roof systems
- Technical audit of Main line production line for the assembly of roof systems
- Technical audit of Panel line production line for the assembly of roof systems,
- Technical audit of Glass bonding OTC production line for the assembly of roof systems,
- Technical audit of POP UP ASSEMBLY 2 Daimler, Iveco production line for the assembly of roof systems,
- Technical audit of Cover assembly Daimler production line for the assembly of roof systems,
- Technical audit of POP UP ASSEMBLY 2 Man production line for the assembly of roof systems,
- Technical audit of VOLVO production line for the assembly of roof systems,
- Technical audit of production equipment, machinery and assembly tables in SPR Iveco area,
- Technical audit of production equipment, machinery and assembly tables in Haltegriff G1, G2 areas,
- Technical audit of production equipment, machinery and assembly tables in Covers (Daimler, Iveco) area,
- Technical audit of production equipment, machinery and assembly tables in Rear glass assy area,
- Technical audit of production equipment, machinery and assembly tables in POP UP ASSEMBLY (Daimler,Iveco, Daf) area,
- Technical audit of production equipment, machinery and assembly tables in POP UP ASSEMBLY 2 (Iveco) area,
- Technical audit of production equipment, machinery and assembly tables in SUN SHADE (Daf) area,
- Technical audit of production equipment, machinery and assembly tables in COVER ASSEMBLY (Daimler) area,
- Technical audit of Renault Edison Production Modules production line for roof systems,
- Technical audit of P1300 Mini assembly line production line for roof systems,
PHOENIX Zdravotnícke Zásobovanie a.s.
- Technical audit of electrostatic conductive flooring in rooms 1B.01.05 and 1B.01. 01, addition to office and operations building at PHOENIX Zdravotnícke zásobovanie, a.s. 2341m2.
Apartment building at ul. Andreja Hlinku no. 18
- Report on periodic specialized inspection and testing of electrical installation in common areas - entrance no. 28.
- Report on periodic specialized inspection and testing of electrical installation in common areas - entrance no. 30.
- Report on periodic specialized inspection and testing of electrical installation in common areas - entrance no. 32.
- Report on periodic specialized inspection and testing of electrical installation in common areas - entrance no. 34.
- Report on periodic specialized inspection and testing of electrical installation in common areas - entrance no. 36.
- Report on periodic specialized inspection and testing of electrical installation in common areas - entrance no. 38.
- Report on periodic specialized inspection and testing of lightning protection system on apartment building no. 18
Billa Shopping Center, Nové Mesto nad Váhom
- Technical audit of electrical appliances and hand tools.
SHOPPING CENTER (EXTENSION OF YARD WINGS) Hlohovec
- Technical audit of electrical connection,
- Technical audit of electrical installation for connection of building switchgear,
- Technical audit of interior electrical installation,
PUCARO ELEKTRO-ISOLIERSTOFFE GmbH - o.z. Piešťany
- Technical audit of electrical installation in production areas,
- Technical audit of electrical appliances and hand tools,
- Technical audit of lightning protection systems,
- Technical audit of electrical installation in gas regulator station,
- Technical audit of electrical installation to assess the condition of power factor correction condensers,
ENL SK s.r.o. Technical Plastic Solutions
- Technical audit of electrical appliances and hand tools,
- Technical audit of electrical installation in production building,
CONTINENTAL MATADOR RUBBER, s.r.o.
- Technical audit of conductive flooring in production areas,
IHT s.r.o.
- Technical audit of electrical appliances and hand tools.
BIAR s.r.o.
- Technical audit of electrical installation in Bella fitness center.
Apartment building at ul. Lipová, Piešťany
- Technical audit of apartment units
- Technical audit of feeder cables to the apartments
Addition to apartment building at Tajovského 18, Trnava
- Technical audit of feeder cabling to apartment building,
- Technical audit of electrical installation in common areas of the apartment building,
- Technical audit of electrical installations in apartment units (14 apartments),
BELAR a. s.
- Technical audit of electrical installation on grain silos (6 x 9475 ton) Čiližská Radvaň,
- Technical audit of electrical installation on grain silos (6 x 3900 ton) Čiližská Radvaň,
Atelier Galery s.r.o. Stará Turá
- Technical audit of electrical installation for connecting a LAUGOTHERM electric heating system,
Apartment building at ul. Valová 12, Piešťany
- Technical audit of lighting protection system for the apartment building
AGRO VOS spol. s.r.o. Veselé
- Cooperation during the technical audit of electrical installation on storage silos for cereals and transportation routes for stored materials at Enviral a. s. Leopoldov,
- Cooperation during the technical audit of electrical installation for the "old and new route" technical procedure at the existing grain silo at Enviral a. s. Leopoldov,
- Technical audit of construction site switchgear for LYCOS spol. s.r.o. Trnavské sladovne,
BETÓN Borovce spol. s.r.o.
- Technical audit of electrical installation for low voltage connection and water removal system used in the excavation zone (180 m of aerial cabling),
Apartment building at ul. Nálepkova 16 and 18, Piešťany
- Technical audit of electrical installation in the apartment building's distribution riser and feeders to individual apartment units,
DUSLO a.s. Šaľa
- Technical audit of electrical installation for camera systems used to monitor process equipment and technical procedures,
- Technical audit of low voltage switchgear for camera systems,
- Technical audit of electrical installation for the autonomous population warning system,
- Technical audit of electrical installation for the camera system used to monitoring technical processes (ammonia plant).
ELTEST spol. s.r.o. Vrbové
- Technical audit of electrical equipment used for testing semi-conductor components
MASIP Hubina
- Technical audit of electrical installation in the assembly hall for the production of floating spoilers
- Technical audit of lighting in production areas,
- Technical audit of lighting protection system on production buildings,
OCEANIK - pool manufacturing, Hlohovec - Šulekovo
- Technical audit of electrical installation in production buildings and connected electrical equipment - production machinery,
- Technical audit of non-production areas,
- Technical audit of lightning protection system,
P&H MATADORKA Trenčín
- Technical audit of low voltage connection,
- Technical audit of electrical installation in office and tire service building (reference and periodical),
- Technical audit of lightning protection system
Roman Catholic Church in Veselé
- Technical audit of electrical installation of the low voltage connection,
SEMIKRON spol. s.r.o. Vrbové
- Technical audit of electrical installation in machine maintenance shop,
- Technical audit of electrical installation for sandblasting, axial tin plating, encapsulation and lighting of production hall LPR 2, office premises SO 02 and covered Canalis bus bar system in LPR 1,
- Technical audit of incineration equipment to dispose of toluene vapors: electrical installation, technical equipment and lightning protection system,
- Technical audit of electrical installation for site lighting,
- Technical audit of covered Schneider electric KSA 3L+N+PE, (400A) distribution bus,
- Technical audit of building lightning protection system - separate lighting rod for HVAC equipment and piping systems on roof of Semipack 1.6 building,
- Technical audit of electrical installation in humidifier EA 190.04 to condition air in the soldering production hall,
- Technical audit of electrical installation in flammable storage area,
- Technical audit of lightning protection system for the production hall,
- Technical audit of machine tool equipment,
Secondary Trade School, Bratislava Rača
- Technical audit of electrical installation in pavilion E - dormitory,
WABASH spol. s.r.o. Krakovany
- Technical audit of technological and production lines,
- Technical audit of machinery, equipment, appliances and hand tools,
- Technical audit of production hall buildings and their lightning protection systems,
Primary school 7, ul. Brezová Piešťany
- Technical audit of electrical installation (classrooms, physical education rooms, lighting in the canteen and low voltage switchgear),
Hella Slovakia Front lighting s.r.o., Kočovce
- Technical audit of electrical installation for robotic KM1 workstation used to remove presswork from Krauss Maffei injection presses and load them on a conveyor belt,
- Technical audit of electrical installation for robotic KM4 workstation used to remove presswork from Krauss Maffei injection presses and load them on a conveyor belt,
- Technical audit of electrical installation for robotic KM7 workstation used to remove presswork from Krauss Maffei injection presses and load them on a conveyor belt,
Hella Slovakia Signal lighting s.r.o., Bánovce nad Bebravou
- Technical audit of electrical installation for robotic KM1200-3 workstation and operating area for the iRB 4600 handling robot used to remove presswork from forms and load them on a conveyor belt,
- Technical audit of electrical installation for robotic workstation comprised of iRB 4400, iRB 1600 and iRB 1400 handling robots to remove presswork from forms and load them on a conveyor belt through the individual curing stations,
C.E.P. SCHERDEL PRUŽINY s.r.o., Myjava
- Technical audit of electrical installation for robotic workstation - welding cell,
ZF Sachs Slovakia a.s., Trnava
- Technical audit of electrical installation for robotic workstation used to weld components for hydrodynamic drives using an iRB 1600 handling robot,
Fitness sity, Piešťany
- Technical audit of electrical installation at fitness center,
Saint-Gobian Construction Products, s.r.o., Division Rigips Trnava
- Technical audit of electrical installation for automatic tool used to produce TVZ-2P skirting boards,
- Technical audit of electrical installation of feeder cabling to switchgear RM1, RM2, RM3 and RMS1 and outlet panels ZS1,
- Technical audit of electrical installation for artificial lighting in production area,
- Technical audit of electrical installation of the compressor station,
- Technical audit of electrical appliances, hand tools and moving cabling feeders,
LIDL Slovenská republika, v.o.s. Bratislava
- Measurements in premises with electrostatic conductive flooring in the office building located at Rožňavská 1/A,
MAMA spol., s.r.o. Nové Zámky
- Periodical technical audit of lighting protection system for buildings A1, A2, A3, A4, A5, A6 and A7,
- Period technical audit of lighting protection system for building B36 (storage hall),
- Period technical audit of lighting protection system for building B13 (transformer station),
Oceanik Marek Novosad
- Technical audit of electrical installation of assembly hall - building SO 01 to produce pool covers,
- Technical audit of electrical installation of low voltage connection for building SO 01,
- Periodic technical audit of lighting protection system for curved hall building,
OMS spol., s.r.o. Senica
- Measurements on electrostatic conductive flooring in LED light production hall,
Apartment building in Dolné Záplotie apartment complex (Town of Trebatice)
- Technical audit of electrical installation for common areas of the apartment building,
- Technical audit of electrical installation for individual units,
- Technical audit of the building's lighting protection system,
Electrical installation work
PPS s.r.o. Plant Propagation Slovakia
- Installation of outlet panels in production areas for the connection of machine tool equipment,
- Modification of production equipment,
J.M.L.I. spol. s.r.o.
- Installation of low voltage connection, modification of switchgear for indirect measurement, installation of cabling to connect to AlFe aerial line,
- Installation of feeder cabling for production building (production of dry construction mixes),
- Installation of lighting protection system for the production hall,
- Installation of lighting protection system for the storage hall,
- Installation of lighting protection system for the office and operations building SO 01,
- Installation of electrical wiring for artificial and emergency lighting of operations and storage premises in building SO 02.
AUDI Ingolstadt (Germany)
- Electrical installation work on production equipment - Vahle transport trolley systems in facilities with lifts for transporting body components (A4 Avant model),
- Electrical installation work on door assembly line for A4, A6 and Q5 models in production hall A5,
- Installation of bar code readers in production line to check circulation sheets for the assembled components,
- Installation and power up of safety elements before carts enter the production line.
AUDI Necalsrum (Germany)
- Installation and connection of safety components on the system (transport line) used to transport presswork from the press shop with subsequent removal of scrap metal using electromagnetic loading into wagons (A5 model),
EMAG Leipzig (Germany)
- Electrical installation work on transport systems used to transport metal components between individual production equipment stations for processing,
FORD Valencia (Spain)
- Electrical installation work - connecting controllers on transport carts used to transport Ford FIESTA, FUSION and FOCUS models on the final assembly production line,
MECALUX Fustinana (Spain)
Electrical installation work:
- Installation of cabinet-mounted electrical switchgear,
- Installation of cabling from primary electrical switchgear to storage areas in the building,
- Pulling of cabling to electrical components of the roller track and operator stations used to transport and sort shipping pallets,
- Electrical installation for transport shelf loaders,
- Connection of cabling to low voltage and extra-low voltage switchgear,
MERCEDES-Benz Sindelfingen (Germany)
- Electrical installation work for transport tracks used to transport bodies.
SCANIA Södertalje (Sweden)
- Replacement, rewiring and refurbishment of switchgear and operator stations on the final chassis assembly line for trucks and buses.
SEAT Martorell (Spain)
Electrical installation work:
- Replacement of operator stations with PLC cards and modular components in the welding hall,
- Installation of cabinet-mounted switchgear for production lines,
- Electrical installation for welding cells used for Seat ALTEA, ALTEA XL and ALTEA FREETRACK models,
- Electrical installation for transport trolley systems used to transport body components,
- Installation of safety components used on protective screens around technological installation - robotic welding stations,
VOLKSWAGEN Pamplona (Spain)
Electrical installation work:
- Electrical installation of robotic welding stations (accessory on rear hatch for VW Polo model) using KUKA handling and transport robots,
- Installation of equipment switchgear,
- Connection of stations from the enclosed bus bar installed in the welding hall (height of +6.3 m),
- Installation of cabling runs in the operating space of work stations,
- Pulling and connecting cabling runs,
WETRON Components GmbH Rosenheim (Germany)
Production, connection and storage of components for the controllers used with transport cards and transport tracks,